A computer program development for a garment's pre-cost account calculation in apparel industry

dc.authorscopusid57204638557
dc.authorscopusid8695070600
dc.contributor.authorEren E.R.
dc.contributor.authorPamuk O.
dc.date.accessioned2023-01-12T20:26:08Z
dc.date.available2023-01-12T20:26:08Z
dc.date.issued2020
dc.departmentN/A/Departmenten_US
dc.description.abstractThe minimum difference between the pre-cost and actual cost in the apparel sector is very important for the enterprises to sustain their profitability. The fact that the estimated unit cost calculation requirement is very frequent and continuous in an environment where competition is increasing rapidly increases the workload of enterprises. In order to be able to take orders, companies must calculate the pre-cost estimation as close as possible to the actual cost. At this stage, companies encounter problems in fabric cost estimation which has the largest share especially in product cost. In this study, a computer program, which will be used in both weaving and knit top clothing group, has been formed in order to lighten the loads of apparel companies on the pre-unit cost calculation. The interface of the computer program is formed in C # programming language using Visual Studio and DevExpress programs. The most important attribute of this program is that, it can calculate the product unit fabric quantity and marker efficiency by using only the product measurement table without the need of a model design department. In order to achieve this, equations were created in the area of calculation of product pattern areas. The program incorporates all cost components in a progressive calculation and consequently presents a product pre-cost report. The computer program was performed in two companies that work in the field of export of woven and knit top apparel in Izmir. The data obtained from the program were compared with the actual data from the companies. © 2020 Ege Universitesi. All rights reserved.en_US
dc.identifier.doi10.32710/tekstilvekonfeksiyon.570717
dc.identifier.endpage180en_US
dc.identifier.issn13003356
dc.identifier.issn1300-3356en_US
dc.identifier.issue2en_US
dc.identifier.scopus2-s2.0-85091498506en_US
dc.identifier.scopusqualityQ3en_US
dc.identifier.startpage171en_US
dc.identifier.urihttps://doi.org/10.32710/tekstilvekonfeksiyon.570717
dc.identifier.urihttps://hdl.handle.net/11454/79904
dc.identifier.volume29en_US
dc.indekslendigikaynakScopusen_US
dc.language.isoenen_US
dc.publisherEge Universitesien_US
dc.relation.ispartofTekstil ve Konfeksiyonen_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectAmount of unit fabricen_US
dc.subjectComputerized cost calculationen_US
dc.subjectCost of fabricen_US
dc.subjectPreliminary costen_US
dc.subjectProduct cost in apparelen_US
dc.subjectUnit costen_US
dc.titleA computer program development for a garment's pre-cost account calculation in apparel industryen_US
dc.typeArticleen_US

Dosyalar