Scheduling jobs through multiple parallel channels using an expert system

Küçük Resim Yok

Tarih

2007

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

Taylor & Francis Ltd

Erişim Hakkı

info:eu-repo/semantics/closedAccess

Özet

In recent years, as a result of global competition, the efficiency and effectiveness of business processes are becoming much more critical than ever. Information technology constitutes a critical role as a strategic competitive tool in the global business market. In the previous paradigm, the holistic view was missing and ultimately did not contain real life constraints. The new paradigm is based on the systems approach and represents the real life circumstances of production with applicable and sufficient models. This study is based on an expert system for the scheduling of a manufacturing system. The expert system works with a unique algorithm, which has been developed in this paper. The aim is to develop an expert scheduling system which is realistic and applicable to real life situations. Job specification, machine competence, due date, earliest completion and minimum set up time are the factors which have been taken into account to achieve this aim. As a result, the algorithm achieves both applicability and optimality in solution.

Açıklama

Anahtar Kelimeler

scheduling, production planning, expert system

Kaynak

Production Planning & Control

WoS Q Değeri

Q2

Scopus Q Değeri

Q1

Cilt

18

Sayı

1

Künye