Tahtali, GurhanOlgun, HayatiGunes, MustafaHepbasli, Arif2023-01-122023-01-1220211742-82971742-83001742-82971742-8300https://doi.org/10.1504/IJEX.2021.118717https://hdl.handle.net/11454/77969The main objective of this study is to comprehensively perform exergy analysis of the tunnel furnace and the tunnel dryer, which was selected as the control volume and involved in a brick production line. The analysis was based on the real data measured over a one-year period at a working brick factory with a daily production capacity of 392 tons of fired bricks. Energy and exergy efficiencies of the control volume were obtained to be 76.46% and 12.90% for dead state values of 25 degrees C and 1.013 atm, respectively.en10.1504/IJEX.2021.118717info:eu-repo/semantics/closedAccessbrick factorytunnel furnacetunnel dryerenergy and exergy analysisKilnOptimizationEnergyFuelExergy analyses of a tunnel furnace and a tunnel dryerArticle362-4208226WOS:0007145636000052-s2.0-85118877629Q3Q4